DATES CLÉS

  • July 2023

    Nuclear Policy Council visit

    The Nuclear Policy Council has approved continued investment by the...
  • June 2023

    JHR direction welcomes national and local elected representatives

    JHR direction welcomes national and local elected representatives
  • 2022

    2022

    Q2022 dummy assembly of the reflector
  • 2021

    2021

    Underwater tests of the EMI conveyor
  • 2020

    2020

    Delivery of the assembly building
  • 2020

    2020

    Assembly of the reactor block
  • 2019

    2019

    Official visit of a JAEA delegation
  • 2019

    2019

    Official visit of a Chinese delegation
  • 2019

    2019

    Official visit of an IAEA delegation
  • 2018-2019

    2018-2019

    Construction of the workshop used for the no-load assembly of...
  • 2018

    2018

    Installation of the reactor building doors
  • 2018

    2018

    New arrangements made to the two backup auxiliary buildings
  • 2017

    2017

    Closure of the nuclear auxiliary building roof
  • 2017

    2017

    End of civil engineering work on the nuclear unit  
  • 2016

    2016

    Official visit of a delegation from Univer du Maroc
  • 2016

    2016

    Official visit of a Japanese delegation
  • 2016

    2016

    Installation of the handling cranes in the nuclear auxiliary building
  • 2016

    2016

    End of structural work on the hot cells
  • 2016

    2016

    Installation of the stack
  • 2015

    2015

    Pre-stressed concrete work on the reactor building
  • 2015

    2015

    Official visit of Mr Fergusson, the Australian government advisor in...
  • 2014

    2014

    Pouring of the concrete for the reactor dome
  • 2014

    2014

    Official visit of a Czech Republic delegation
  • 2014

    2014

    Works in the reactor hall
  • 2014

    2014

    Official visit of a Finnish delegation
  • 2014

    2014

    Official visit of Mr Barroso, the European Commission President
  • 2013

    2013

    Installation of the reactor dome structure
  • 2013

    2013

    Installation of the polar crane
  • 2012

    2012

    End of works on the reactor containment
  • 2011

    2011

    Construction of the reactor containment
  • 2010

    2010

    Visit from Prime Minister François Fillon
  • 2010

    2010

    Works on the upper basemat
  • 2009

    2009

    Works on the lower basemat and seismic supports    
  • 2007-2008

    2007-2008

    Excavation work and consolidation of the rock face
  • 2007

    2007

    Positive outcome of the public enquiry and start of works
  • 2006

    2006

    Launch of the public enquiry
  • 2005

    2005

    Local consultation process

Evolution of the construction site
Institutional milestones
Official visits

RJH